Brunni cable car History

To enter the sunny side of Engelberg with a cable car had been a long desired wish. Several potential locations were inspected, and on 23 February 1952 the cable car from Engelberg to Ristis was opened. In the early days, twelve-seater cable cars brought passengers up to Ristis and the "Ristis Stübli", a cosy mountain restaurant bathed in sunlight. 

 

Over the last 50 years, a number of reconstructions and enlargements were needed. The twelve-seater cabin was adapted to accommodate 40 persons; the mountain and valley stations were modernised to cope with the extra numbers of visitors; and the Ristis mountain restaurant was built and later extended. Then, with the upcoming renewal of the license for the cable car in 2010, the company started thinking about renovating and extending the cableway network. 

 

A situation analysis followed and the company decided that a new cable car with a new location in Engelberg was the best solution to meet future demands The new cable car for 65 persons with the new routing and new valley and mountain stations opened in December 2008.

1942 Commissioning of the T-bar lift (Manufacturer: Sigrist) at the Klostermatte with a capacity of 250 p/h
1950 November 9 Issuing of the licence to operate a cable car to Ristis from Engelberg town (Hinterdorfstrasse 12)
1951 April 9 Registration of the "Luftseilbahn Engelberg-Brunni AG" in the commercial register
1952 February 23 Opening of the cable car with a 12 seat cabin, capacity of 480 p/h
1957 Commissioning of the T-bar lift (Manufacturer: Müller) from Ristis to the Brunnihut SAC with a capacity of 900 p/h
1960 Reconstruction of the cable car into a 40 person cabin cable car and the new building of the restaurant Ristis at todays location
1960 Commissioning of the T-bar lift (Manufacturer: Städeli) from Brunnihut SAC to Schonegg with a capacity of 600 p/h (afterwards this lift is rebuilded in another T-bar lift with a capacity of 390 p/h)
1963 Replacement of the ski lift by a T-bar lift with a new routing (Manufacturer: Städeli) with a capacity of 680 p/h
1970 Commissioning of the left platter lift (Manufacturer: Städeli) at the Klostermatte with a capacity of 450 p/h
1980 Enlargement of restaurant Ristis and rebuiling of the cable car mountain station.
1988 Extension of the restaurant with a children play area and a 4 room apartment for the tenants
1989/90 Renovation of the cable car Engelberg - Ristis and replacement of the cabin with a new one for 45 persons
1993 Build of the 3 seater chairlift Ristis - Brunnihut SAC (Manufacturer: Leitner) with a capacity of 1200 p/h, as a replacement for the T-bar lift
1993 Commissioning of the summer toboggan run at Ristis (Manufacturer: Wiegland)
1994 Opening of the Brunni trail - A nature learn path of the alpine region
1997/99 Redesign of the mid section of the Bergrestaurant Ristis and extension of the restaurant with a new part "Wintergarten"
2000 Opening of the "Härzlisee" the heart formed lake and the installation of snowmaking machines in Brunni
2004 "Luftseilbahn Brunni Engelberg AG" takes over "Skilifte Klostermatte AG"
2005 Replacement of the snow cannons at the Klostermatte
2008 December 12 Opening of the new cable car Engelberg - Ristis with a 65 persons cabin and a capacity of 640 p/h
2007/09 Replacement of the ski lift Klostermatte
2010 January 1 Amalgamation of "Luftseilbahn Brunni Engelberg AG" and "Brunni Sessel-und Skilifte AG"
2013 Complete revision of the chairlift with new control and installation of a conveyor belt
2013 Built of Family restaurant OX, integrated skirental, skischool office and a slope groomers garage, new electronics for the Klostermatte
2014 Build of the via ferrata "Rigidalstockwand"
2015 Opening Globis alpine playground at Ristis
2015 June 2 Renaming the company from "Luftseilbahn Engelberg-Brunni AG" to "Brunni-Bahnen Engelberg AG"
2015 New installation of LED-lights on the Klostermatte ski slope for night skiing
2016 August 8 Opening berglodge Ristis with 7 bedrooms and 41 beds - opening barefoot trail Ristis - Brunnihut and opening forest fireplace Ristis
2019 June 29 Reopening of the reconstructed restaurant Ristis
2019/20 new construction of retaining wall and widening of pists
2020 construction of a snowmaking system for the toboggan run
2021 remodeling of office and extension of toilet facilities valley station
2021 Office conversion and extension of toilet facilities at the bottom station of the cable car. Old Brunni cable car returns to the area as a Tiny House. Seasonal overnight accommodation at 1,880 m above sea level.
2022/23 New ticketing system at the summer toboggan run and in the restaurants. Floor renovation of the mountain and valley stations of the gondola. Purchase of new turnstiles at the Klostermatte.
  ·  